boiler hydrotest pressure
Others

Molten salt heaters use molten potassium nitrate and sodium nitrite as heating media. Molten salt heater will heat the powder salt over the melting point until the viscosity of the molten salt allows circulating pump works, after the whole system is under circulating condition, then feed then into the thermal fluid heater for further circulating rising temperature to make it to be recycling used. Normal media working temperature is 400-550℃, top working temperature could reach 600℃.

Technical advantages

Digitized manufacture

  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of square coil tube adopts CNC three-dimensional tube bending machine, no forced shaping.
  • The manufacture of serpentuator adopts serpentuator automatic production line, once-forming.

Long life span

  • The optimized radiation heating surface and convective heating surface, the medium flow is more reasonable, without overheat of the carrier and reduce the life;
  • Convection section: optimize convection heating surface and adopt effective fix and structural support to make its working life longer.
  • Set up effective flue gas partition for convection heating surface and cast partition to make it works longer.

Less fuel consumption

  • Use superior refractory brick to build inside and superior perlite in the middle. Keep the furnace temperature under 50℃ to make the minimization of loss.
  • Furnace adopts double close line coil, which makes heating surface sufficient.

Add Comment

Pressure Testing Safety Procedure - PO

Pressure Testing Safety Procedure Pressure testing and pressure leak testing are potentially hazardous operations and it is demineralized water up to 30 ppm for testing of boiler if the superheater tube metallurgy is austenetic stainless steel.

Presentation title, second line as need

Boiler Hydrotest - Purpose After installation of all pressure parts and any tube replacements the Boiler is subjected to Hydrostatic pressure. This is done to ensure healthiness of material and correctness of workmanship. This is also a statutory requirement with respect to IBR.

HYDROSTATIC PRESSURE TESTING OF PIPING (PROJECT STANDARD

HYDROSTATIC PRESSURE TESTING OF PIPING (PROJECT STANDARDS AND SPECIFICATIONS) Page 3 of 19 Rev: 01 July 2011 Minimum Test Pressure - The lowest allowable test pressure gauge reading (the calculated test pressure plus the additional pressure resulting from the static head of the test fluid).

Hydrostatic test - Wikiped

A hydrostatic test is a way in which pressure vessels such as pipelines, plumbing, gas cylinders, boilers and fuel tanks can be tested for strength and leaks. The test involves filling the vessel or pipe system with a liquid, usually water, which may be dyed to aid in visual leak detection, and pressurization of the vessel to the specified test

Boiler hydrotest - ASME (mechanical) Code Issues - Eng-Ti

Boiler hydrotest Boiler hydrotest alizali (Materials) (OP) 10 Nov 15 11:13. dear for a water tube boiler that works over 10 years, without any welding after hydro test with 1.5 times MAWP (MT, UT) and visual examination to determine the health of the boiler pressure retaining items.

HYDROSTATIC TEST PROCEDURE.pdf | Pressure - Scri

HYDROSTATIC TEST PROCEDURE. 1. SCOPE This procedure establishes the steps to be followed for conducting the Hydrostatic test in pressure vessels constructed in accordance with the rules of the ASME Boiler and Pressure Vessel Code Section VIII Division 1.

Hydrotest Pressure on Vessel Nameplate - Boiler an

If the pressure vessel was designed and fabricated in accordance with the rules of ASME Section VIII, Div 1, the nameplate of the vessel must be stamped in accordance with UG-118, specifically Figure UG-118 (page 91 of the 2001 Edition of Section VIII, Div 1 , 2003 Addendum).

Hydrotest Procedure | Boiler | Pipe (Fluid Conveyanc

The deflection of boiler roof girders before the boiler pressure parts lifting as well as the record of before and after water filled.1 The erection of boiler steel structure shall be completed. and superheated as well as associated inter connecting piping. steam drum. high temperature tube banks. drains.

Presentation title, second line as need

Boiler Hydrotest - Purpose After installation of all pressure parts and any tube replacements the Boiler is subjected to Hydrostatic pressure. This is done to ensure healthiness of material and correctness of workmanship. This is also a statutory requirement with respect to IBR.

Hydrostatic Test - KAKA Engineering, we're driving the futu

Hydrostatic Test ใน ถัง ท่อ ภาชนะรับแรงดัน เช่น Boiler/ Pressure vessel/ Piping/ ถังรับแรงดัน ASME Pressure Vessel Code ระบุ 30

Pressure Vessel Design – Operating Pressure, Desig

The internal pressure at which the weakest element of the vessel is loaded to the ultimate permissible point , when the vessel is assumed to be in corroded condition, under the effect of a